What are the precautions for installing and laying domestic stainless steel water pipes

Jul 31, 2014

Fág nóta

The domestic stainless steel water pipe laying project is a very basic construction project in the management of hydropower construction projects. If there is a problem with the paving of the stainless steel water supply pipe, it will greatly damage the safety and health of the tap water that must be used in the daily life of the majority of families. In order to bury various hidden dangers for future home improvement, the editor will sort out the following issues and points that should be paid attention to in the decoration of stainless steel water supply pipelines.

Question 1: If the installation of domestic stainless steel tap water pipes does not meet the technical specifications, and the partition exceeds or is less than 15 cm, it will cause the water outlet of the electric water heater to be disconnected from the water pipe. Acceptance points: You can take a ruler to measure immediately, cut the tube 15 cm to reach the standard, and the error is guaranteed to be within 0.1 cm.

Stainless steel water pipe manufacturers

Question 2: The gas pipeline was pressed into the stainless steel tap water pipe that day, which could easily cause the tap water pipe to leak or the natural gas leak. Acceptance essentials: take a ruler to measure, the distance between the natural gas pipeline and the stainless steel water pipe should be more than 10 cm.

Question 3: Press the domestic stainless steel tap water pipe directly on the strong and weak current threading pipe. If the pipeline leaks or leaks into the wall, the cables in the conduit will be damp, causing a leakage state. Acceptance essentials: It is strictly forbidden to press the stainless steel tap water pipe on the strong and weak current threading pipe. It is necessary to distinguish between the stainless steel tap water pipe and the strong and weak current pipe.

Question 4: The stainless steel water pipe and the strong and weak electrical pipeline are buried in the same box, which is unsafe and dangerous. Since water is an electrical conductor, if it is energized, the entire building will be connected to the power source. Acceptance points: The pipes of the hydropower project must be placed in separate slots, and the distance between the two pipes is 15 cm.

Question 5: There are redundant connecting pipes around the connecting port of the domestic stainless steel tap water pipe, which is easy to leave a safety hazard of water leakage. Acceptance points: In order to ensure that both sides of the stainless steel water supply pipeline are directly connected by elbows, there is no need to connect redundant pipe fittings.